2016 FIELD WORK DAY
CLICK ON IMAGE TO ENLARGE IT!
THE SCHEDULED WORK DAY WAS A BIG SUCCESS! MANY ACTIVE CLUB MEMBERS CAME
OUT TO SHARE THE WORK REQUIRED TO GET THE BUILDING, FIELD AND FENCES REPAIRED
AND CLEANED. WE HAVE A GREAT CLUB AND IT SHOWS WITH ALL THE CO-OPERATION
THAT WAS EVIDENT WITH THOSE THAT ATTENDED. EVERYONE WORKED TOGETHER AND
ALTHOUGH THERE WERE TIMES DIFFERENT POINTS OF VIEW WERE EVIDENT,  EVERYONE
COMPROMISED FOR THE COMMON GOOD OF THE CLUB. EXCELLENT IS THE ONLY WORD TO
DESCRIBE THE DAY.
THE WORK FORCE CONSISTED OF: BUD YOUNG, LEONARD  & SAVANNAH BREWER, JERRY
OYSTER, JENN MANN, GERRY AND MATT CATES, RICK KIRKHAM, MARK STRAUB, CLAY ELLS,
ROD BON AND DOUG WILLIAMS. THE WORK CONSISTED OF REPAIRING THE SLIDING DOOR
ON THE BUILDING, REPAIRING THE FENCE, WASHING DOWN THE BUILDING, GENERAL CLEAN
UP OF THE BUILDING (TEARING DOWN OLD TABLES ETC.) AND THE FIELD MOWED. THE ROOF
WAS INSPECTED AND IS IN NEED OF REPAINTING. THIS ITEM WILL BE DISCUSSED AT THE
NEXT MEETING. PIZZA WAS THE REWARD FOR THE HARD DAY OF WORK EVERYONE PUT IN.
A PICK UP MEETING WAS HELD TO DECIDE ABOUT DEMOLITION OF THE TABLES AND ALSO
JERRY OYSTER AND BUD YOUNG WERE ELECTED TO THE BOARD OF DIRECTORS.